A new approach for solving capacitated lot sizing and scheduling problem with sequence and period-dependent setup costs
<p><strong>Purpose:</strong> We aim to examine the capacitated multi-item lot sizing problem which is a typical example of a large bucket model, where many different items can be produced on the same machine in one time period. We propose a new approach to determine the production...
Main Authors: | Imen Chaieb Memmi, Sondes Hammami Laaroussi |
---|---|
Format: | Article |
Language: | English |
Published: |
OmniaScience
2013-09-01
|
Series: | Journal of Industrial Engineering and Management |
Subjects: | |
Online Access: | http://www.jiem.org/index.php/jiem/article/view/707 |
Similar Items
-
Capacitated Lot-Sizing Problem with Sequence-Dependent Setup, Setup Carryover and Setup Crossover
by: Jangha Kang
Published: (2020-07-01) -
Simulation Optimization for the Stochastic Economic
Lot Scheduling Problem with Sequence-Dependent
Setup Times
by: Löhndorf, Nils, et al.
Published: (2014) -
Fix-and-Optimize Heuristic and MP-based Approaches for Capacitated Lot Sizing Problem with Setup Carryover, Setup Splitting and Backlogging
Published: (2015) -
Lot size scheduling problem with two level setup cost/time structure
by: Chung, Jae Hyun
Published: (2008) -
Modeling, Analysis and Solution Approaches for Some Optimization Problems: High Multiplicity Asymmetric Traveling Salesman, Primary Pharmaceutical Manufacturing Scheduling, and Lot Streaming in an Assembly System
by: Yao, Liming
Published: (2014)