A Capacity-Restraint Transit Assignment Model When a Predetermination Method Indicates the Invalidity of Time Independence
The statistical independence of time of every two adjacent bus links plays a crucial role in deciding the feasibility of using many mathematical models to analyze urban transit networks. Traditional research generally ignores the time independence that acts as the ground of their models. Assumption...
Main Authors: | , , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2015-01-01
|
Series: | Mathematical Problems in Engineering |
Online Access: | http://dx.doi.org/10.1155/2015/821574 |
id |
doaj-053d337bdbfa41b0bfb279ec5bdf46f1 |
---|---|
record_format |
Article |
spelling |
doaj-053d337bdbfa41b0bfb279ec5bdf46f12020-11-24T22:16:18ZengHindawi LimitedMathematical Problems in Engineering1024-123X1563-51472015-01-01201510.1155/2015/821574821574A Capacity-Restraint Transit Assignment Model When a Predetermination Method Indicates the Invalidity of Time IndependenceHaoyang Ding0Yu Bao1Sida Luo2Hanxia Shen3Wei Wang4Man Long5Jiangsu Key Laboratory of Urban ITS, Southeast University, Nanjing 210096, ChinaJiangsu Key Laboratory of Urban ITS, Southeast University, Nanjing 210096, ChinaJiangsu Key Laboratory of Urban ITS, Southeast University, Nanjing 210096, ChinaJiangsu Key Laboratory of Urban ITS, Southeast University, Nanjing 210096, ChinaJiangsu Key Laboratory of Urban ITS, Southeast University, Nanjing 210096, ChinaJiangsu Key Laboratory of Urban ITS, Southeast University, Nanjing 210096, ChinaThe statistical independence of time of every two adjacent bus links plays a crucial role in deciding the feasibility of using many mathematical models to analyze urban transit networks. Traditional research generally ignores the time independence that acts as the ground of their models. Assumption is usually made that time independence of every two adjacent links is sound. This is, however, actually groundless and probably causes problematic conclusions reached by corresponding models. Many transit assignment models such as multinomial probit-based models lose their effects when the time independence is not valid. In this paper, a simple method to predetermine the time independence is proposed. Based on the predetermination method, a modified capacity-restraint transit assignment method aimed at engineering practice is put forward and tested through a small contrived network and a case study in Nanjing city, China, respectively. It is found that the slope of regression equation between the mean and standard deviation of normal distribution acts as the indicator of time independence at the same time. Besides, our modified assignment method performs better than the traditional one with more reasonable results while keeping the property of simplicity well.http://dx.doi.org/10.1155/2015/821574 |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Haoyang Ding Yu Bao Sida Luo Hanxia Shen Wei Wang Man Long |
spellingShingle |
Haoyang Ding Yu Bao Sida Luo Hanxia Shen Wei Wang Man Long A Capacity-Restraint Transit Assignment Model When a Predetermination Method Indicates the Invalidity of Time Independence Mathematical Problems in Engineering |
author_facet |
Haoyang Ding Yu Bao Sida Luo Hanxia Shen Wei Wang Man Long |
author_sort |
Haoyang Ding |
title |
A Capacity-Restraint Transit Assignment Model When a Predetermination Method Indicates the Invalidity of Time Independence |
title_short |
A Capacity-Restraint Transit Assignment Model When a Predetermination Method Indicates the Invalidity of Time Independence |
title_full |
A Capacity-Restraint Transit Assignment Model When a Predetermination Method Indicates the Invalidity of Time Independence |
title_fullStr |
A Capacity-Restraint Transit Assignment Model When a Predetermination Method Indicates the Invalidity of Time Independence |
title_full_unstemmed |
A Capacity-Restraint Transit Assignment Model When a Predetermination Method Indicates the Invalidity of Time Independence |
title_sort |
capacity-restraint transit assignment model when a predetermination method indicates the invalidity of time independence |
publisher |
Hindawi Limited |
series |
Mathematical Problems in Engineering |
issn |
1024-123X 1563-5147 |
publishDate |
2015-01-01 |
description |
The statistical independence of time of every two adjacent bus links plays a crucial role in deciding the feasibility of using many mathematical models to analyze urban transit networks. Traditional research generally ignores the time independence that acts as the ground of their models. Assumption is usually made that time independence of every two adjacent links is sound. This is, however, actually groundless and probably causes problematic conclusions reached by corresponding models. Many transit assignment models such as multinomial probit-based models lose their effects when the time independence is not valid. In this paper, a simple method to predetermine the time independence is proposed. Based on the predetermination method, a modified capacity-restraint transit assignment method aimed at engineering practice is put forward and tested through a small contrived network and a case study in Nanjing city, China, respectively. It is found that the slope of regression equation between the mean and standard deviation of normal distribution acts as the indicator of time independence at the same time. Besides, our modified assignment method performs better than the traditional one with more reasonable results while keeping the property of simplicity well. |
url |
http://dx.doi.org/10.1155/2015/821574 |
work_keys_str_mv |
AT haoyangding acapacityrestrainttransitassignmentmodelwhenapredeterminationmethodindicatestheinvalidityoftimeindependence AT yubao acapacityrestrainttransitassignmentmodelwhenapredeterminationmethodindicatestheinvalidityoftimeindependence AT sidaluo acapacityrestrainttransitassignmentmodelwhenapredeterminationmethodindicatestheinvalidityoftimeindependence AT hanxiashen acapacityrestrainttransitassignmentmodelwhenapredeterminationmethodindicatestheinvalidityoftimeindependence AT weiwang acapacityrestrainttransitassignmentmodelwhenapredeterminationmethodindicatestheinvalidityoftimeindependence AT manlong acapacityrestrainttransitassignmentmodelwhenapredeterminationmethodindicatestheinvalidityoftimeindependence AT haoyangding capacityrestrainttransitassignmentmodelwhenapredeterminationmethodindicatestheinvalidityoftimeindependence AT yubao capacityrestrainttransitassignmentmodelwhenapredeterminationmethodindicatestheinvalidityoftimeindependence AT sidaluo capacityrestrainttransitassignmentmodelwhenapredeterminationmethodindicatestheinvalidityoftimeindependence AT hanxiashen capacityrestrainttransitassignmentmodelwhenapredeterminationmethodindicatestheinvalidityoftimeindependence AT weiwang capacityrestrainttransitassignmentmodelwhenapredeterminationmethodindicatestheinvalidityoftimeindependence AT manlong capacityrestrainttransitassignmentmodelwhenapredeterminationmethodindicatestheinvalidityoftimeindependence |
_version_ |
1725790840808275968 |