Modeling of a Prosumer in Optimal Design Energy Systems Problem

The conversion of existing energy systems to intelligent integrated energy systems can happen only if economic benefits due to introduction of the intelligent integrated energy systems will exceed required level of investments. Thus, it is necessary for every optimal design energy systems problem ac...

Full description

Bibliographic Details
Main Authors: Barakhtenko Evgeny, Sokolov Dmitry, Tashlykova Veronica
Format: Article
Language:English
Published: EDP Sciences 2019-01-01
Series:E3S Web of Conferences
Online Access:https://www.e3s-conferences.org/articles/e3sconf/pdf/2019/28/e3sconf_mmmaosdphs18_02001.pdf
Description
Summary:The conversion of existing energy systems to intelligent integrated energy systems can happen only if economic benefits due to introduction of the intelligent integrated energy systems will exceed required level of investments. Thus, it is necessary for every optimal design energy systems problem according to the purposes of the study to determine various aspects of equipment configuration, investment and a proposed unit commitment on a case-by-case basis. The studies, taking under consideration energy efficiency of renewable energy units, are particularly important as environmental safety standards are increasing. In the paper optimal design of prosumer energy supply system problem in the intelligent integrated energy system was investigated. For this purpose a super structure for an energy supply system includes different generating capacities with relevant power range. The superstructure for prosumer energy supply system consists of an electric boiler, a gas-fired boiler, a solar photo-voltaic, a solar heating system and a gas-fired CHP. An ability of district energy system to receive the excess generating energy is restricted by the constraints. The heat and electricity tariffs and the received to district energy supply system energy constraints are varying according to time period. As a result of this study, cost-effectiveness analysis of chosen equipment configuration was undertaken.
ISSN:2267-1242