Risk Sharing of Urban Underground Comprehensive Pipe Gallery PPP Project Based on Grey Relational Analysis
In order to establish a reasonable, effective and accurate risk sharing mechanism for PPP project of urban underground comprehensive pipe gallery, 25 risk factors are identified by the work structure decomposition method. Secondly, a risk sharing method based on improved grey correlation analysis is...
Main Authors: | Shixia Duan, Jielin Diao |
---|---|
Format: | Article |
Language: | English |
Published: |
EDP Sciences
2021-01-01
|
Series: | E3S Web of Conferences |
Online Access: | https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/29/e3sconf_eem2021_01015.pdf |
Similar Items
-
Environmental Intelligent Control of Underground Integrated Pipe Gallery Based on Equipment Failure Rate
by: Gang Xue, et al.
Published: (2019-01-01) -
Consideration of risk in PPP-projects
by: Josef Zimmermann, et al.
Published: (2014-06-01) -
A Fuzzy Comprehensive Evaluation Model for Sustainability Risk Evaluation of PPP Projects
by: Libiao Bai, et al.
Published: (2017-10-01) -
Multi agent risk sharing optimization of PPP project in urban garbage disposal -- Based on utility function considering of risk preference
by: Liu Qin, et al.
Published: (2018-01-01) -
Risk management of PPP projects in China
by: Wang, Xinyu
Published: (2017)