Practical Experiences With Torque Meta-Scheduling In The Czech National Grid
The Czech National Grid Infrastructure went through a complex transition inthe last year. The production environment has been switched from a commercialbatch system PBSPro, which was replaced by an open source alternative Torquebatch system.This paper concentrates on two aspects of this transition....
Main Authors: | Simon Toth, Miroslav Ruda |
---|---|
Format: | Article |
Language: | English |
Published: |
AGH University of Science and Technology Press
2012-01-01
|
Series: | Computer Science |
Subjects: | |
Online Access: | http://journals.agh.edu.pl/csci/article/download/32/25 |
Similar Items
-
The Extension Of Torque Scheduler Allowing The Use Of Planning And Optimization In Grids
by: Vaclav Chlumsky, et al.
Published: (2012-01-01) -
Workflow scheduling for service oriented cloud computing
by: Fida, Adnan
Published: (2008) -
Grid task scheduling in P2P Desktop Grids
by: Abidin, S.Z.Z, et al. -
MCTE: Minimizes Task Completion Time and Execution Cost to Optimize Scheduling Performance for Smart Grid Cloud
by: Hualu Zhang, et al.
Published: (2019-01-01) -
Gain Scheduled Torque Compensation of PMSG-Based Wind Turbine for Frequency Regulation in an Isolated Grid
by: Haixin Wang, et al.
Published: (2018-06-01)