Synergetic synthesis of project management system

The paper gives the analysis of methods and tools used in the subject area of project management in scientific and practical researches. It is shown that they do not correspond to the synergetic paradigm of management, but based on the reductionist approach. Project management is considered as the a...

Full description

Bibliographic Details
Main Author: Павел Александрович Тесленко
Format: Article
Language:English
Published: PC Technology Center 2013-09-01
Series:Tehnologìčnij Audit ta Rezervi Virobnictva
Subjects:
Online Access:http://journals.uran.ua/tarp/article/view/18412
id doaj-01e4e040791145c8b9353ddd88210d81
record_format Article
spelling doaj-01e4e040791145c8b9353ddd88210d812020-11-25T02:14:13ZengPC Technology CenterTehnologìčnij Audit ta Rezervi Virobnictva2226-37802312-83722013-09-0155(13)505110.15587/2312-8372.2013.1841218412Synergetic synthesis of project management systemПавел Александрович Тесленко0Odessa State Academy of Civil Engineering and Architecture, str. Didrikhsona, 4, Odessa, 65029The paper gives the analysis of methods and tools used in the subject area of project management in scientific and practical researches. It is shown that they do not correspond to the synergetic paradigm of management, but based on the reductionist approach. Project management is considered as the art of project manager to achieve the desired result. Attempts to formalize the semi-structured project management system do not allow accurate forecast of success or failure of the project. To manage the projects as an open, non-linear, emergent system it is proposed to use the elements of synergistic synthesis, formation of self-organization to asymptotically stable final state. An increase in the dimension of the synthesized system and additional attractors on the phase plane are formed by means of organizing a special set of negative and positive feedback. At the stage of project implementation it is necessary to form the control actions to reduce uncertainty. As a result, the compression of dimension takes place, the trajectory of the system on the phase plane successively moves from one attractor to another, until it reaches the target attractor.http://journals.uran.ua/tarp/article/view/18412project managementsynergistic synthesisattractordirected self-organization.
collection DOAJ
language English
format Article
sources DOAJ
author Павел Александрович Тесленко
spellingShingle Павел Александрович Тесленко
Synergetic synthesis of project management system
Tehnologìčnij Audit ta Rezervi Virobnictva
project management
synergistic synthesis
attractor
directed self-organization.
author_facet Павел Александрович Тесленко
author_sort Павел Александрович Тесленко
title Synergetic synthesis of project management system
title_short Synergetic synthesis of project management system
title_full Synergetic synthesis of project management system
title_fullStr Synergetic synthesis of project management system
title_full_unstemmed Synergetic synthesis of project management system
title_sort synergetic synthesis of project management system
publisher PC Technology Center
series Tehnologìčnij Audit ta Rezervi Virobnictva
issn 2226-3780
2312-8372
publishDate 2013-09-01
description The paper gives the analysis of methods and tools used in the subject area of project management in scientific and practical researches. It is shown that they do not correspond to the synergetic paradigm of management, but based on the reductionist approach. Project management is considered as the art of project manager to achieve the desired result. Attempts to formalize the semi-structured project management system do not allow accurate forecast of success or failure of the project. To manage the projects as an open, non-linear, emergent system it is proposed to use the elements of synergistic synthesis, formation of self-organization to asymptotically stable final state. An increase in the dimension of the synthesized system and additional attractors on the phase plane are formed by means of organizing a special set of negative and positive feedback. At the stage of project implementation it is necessary to form the control actions to reduce uncertainty. As a result, the compression of dimension takes place, the trajectory of the system on the phase plane successively moves from one attractor to another, until it reaches the target attractor.
topic project management
synergistic synthesis
attractor
directed self-organization.
url http://journals.uran.ua/tarp/article/view/18412
work_keys_str_mv AT pavelaleksandrovičteslenko synergeticsynthesisofprojectmanagementsystem
_version_ 1724901044367917056