Summary: | The energy transition is accompanied by developing a digital decentralized low-carbon energy infrastructure with renewable-based generating plants as its main elements. In 2020, 15 photovoltaic power plants (PVPs) with an installed capacity of 364 MW were commissioned in Russia, which is 21.08% of the total installed PVP capacity of Russia. The findings of an analysis of Russia’s current regulatory and technical documents (RTD) concerning the frequency and active power flow control are presented. They indicate that all PVPs must participate in the general primary frequency control (GPFC). This requirement is due to large frequency deviations of transient processes resulting from an emergency active power shortage, which can shut down frequency-maintaining generating plants by relay or process protection devices and industrial consumers with significant damage to them. The requirements suggest full-scale tests of PVP to confirm their readiness for participation in GPFC. The program and results of checking the algorithm of change in the PVP active power, depending on frequency, are demonstrated with an example of one PVP. The full-scale tests confirmed the compliance of the certified PVP with this requirement. The plans for involving PVPs in the power flow control under various topology and operation conditions are considered.
|