Theoretical and Computational Research in Various Scheduling Models

Nine manuscripts were published in this Special Issue on "Theoretical and Computational Research in Various Scheduling Models, 2021" of the MDPI Mathematics journal, covering a wide range of topics connected to the theory and applications of various scheduling models and their extensions/g...

Full description

Bibliographic Details
Format: eBook
Language:English
Published: Basel MDPI - Multidisciplinary Digital Publishing Institute 2022
Subjects:
TOC
Online Access:Open Access: DOAB: description of the publication
Open Access: DOAB, download the publication
LEADER 04499namaa2200949uu 4500
001 doab78824
003 oapen
005 20220224
006 m o d
007 cr|mn|---annan
008 220224s2022 xx |||||o ||| 0|eng d
020 |a 9783036530185 
020 |a 9783036530192 
020 |a books978-3-0365-3019-2 
024 7 |a 10.3390/books978-3-0365-3019-2  |2 doi 
040 |a oapen  |c oapen 
041 0 |a eng 
042 |a dc 
072 7 |a GP  |2 bicssc 
072 7 |a P  |2 bicssc 
720 1 |a Wu, Chin-Chia  |4 edt 
720 1 |a Lin, Win-Chin  |4 edt 
720 1 |a Lin, Win-Chin  |4 oth 
720 1 |a Wu, Chin-Chia  |4 oth 
245 0 0 |a Theoretical and Computational Research in Various Scheduling Models 
260 |a Basel  |b MDPI - Multidisciplinary Digital Publishing Institute  |c 2022 
300 |a 1 online resource (208 p.) 
336 |a text  |b txt  |2 rdacontent 
337 |a computer  |b c  |2 rdamedia 
338 |a online resource  |b cr  |2 rdacarrier 
506 0 |a Open Access  |f Unrestricted online access  |2 star 
520 |a Nine manuscripts were published in this Special Issue on "Theoretical and Computational Research in Various Scheduling Models, 2021" of the MDPI Mathematics journal, covering a wide range of topics connected to the theory and applications of various scheduling models and their extensions/generalizations. These topics include a road network maintenance project, cost reduction of the subcontracted resources, a variant of the relocation problem, a network of activities with generally distributed durations through a Markov chain, idea on how to improve the return loading rate problem by integrating the sub-tour reversal approach with the method of the theory of constraints, an extended solution method for optimizing the bi-objective no-idle permutation flowshop scheduling problem, the burn-in (B/I) procedure, the Pareto-scheduling problem with two competing agents, and three preemptive Pareto-scheduling problems with two competing agents, among others. We hope that the book will be of interest to those working in the area of various scheduling problems and provide a bridge to facilitate the interaction between researchers and practitioners in scheduling questions. Although discrete mathematics is a common method to solve scheduling problems, the further development of this method is limited due to the lack of general principles, which poses a major challenge in this research field. 
540 |a Creative Commons  |f https://creativecommons.org/licenses/by/4.0/  |2 cc  |u https://creativecommons.org/licenses/by/4.0/ 
546 |a English 
650 7 |a Mathematics & science  |2 bicssc 
650 7 |a Research & information: general  |2 bicssc 
653 |a ant colony optimization 
653 |a approximation algorithms 
653 |a constraint programming 
653 |a energy-efficiency 
653 |a equipment combination and configuration 
653 |a equipment idleness 
653 |a flow shop 
653 |a heuristic algorithms 
653 |a heuristic methods 
653 |a late work 
653 |a linear project 
653 |a linear scheduling method 
653 |a logistics 
653 |a markov activity network 
653 |a metaheuristic 
653 |a metaheuristics 
653 |a no-idle flowshop 
653 |a northwest China 
653 |a operations research 
653 |a pareto frontier 
653 |a Pareto-scheduling 
653 |a phase-type distribution 
653 |a polynomial time 
653 |a production management 
653 |a production scheduling 
653 |a relocation problem 
653 |a renewable and non-renewable resources 
653 |a resource recycling 
653 |a resource-constrained scheduling 
653 |a return loading rate 
653 |a scheduling 
653 |a scheduling on parallel machines 
653 |a scheduling theory 
653 |a simulated annealing 
653 |a stochastic makespan 
653 |a subcontracted resources 
653 |a TOC 
653 |a total transport distance 
653 |a trade-off curve 
653 |a two agents 
653 |a two-agent 
653 |a unrelated parallel machine scheduling 
653 |a variable neighborhood descent 
793 0 |a DOAB Library. 
856 4 0 |u https://directory.doabooks.org/handle/20.500.12854/78824  |7 0  |z Open Access: DOAB: description of the publication 
856 4 0 |u https://mdpi.com/books/pdfview/book/4919  |7 0  |z Open Access: DOAB, download the publication